archive-org.com » ORG » C » CIBSELIFTSGROUP.ORG

Total: 42

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • CIBSE Lifts Group Scholarships
    of qualifications The applicant should submit a curriculum vitae the amount applied for and a description of how the money will be used Please include an explanation of how and when the work will be published Applicants are encouraged to consider publication of their work at The Lift and Escalator Symposium www liftsymposium org Please provide contact details for two referees who are in a position to comment on your

    Original URL path: http://www.cibseliftsgroup.org/index.php/home?id=81 (2016-02-10)
    Open archived version from archive


  • Manchester Central Library & Town Hall Project
    of Manchester City Council and Laing O Rourke in utilising strong local skills on such a complex and prestigious project The contract required detailed traffic analysis design and engineering input from the outset The strict requirements of Manchester City Councils Design for Access DFA2 criteria demanding high levels of functionality for all users coupled to a strict aesthetic brief from the architects ANSA were able to meet all of these requirements in house The whole of the project which involved 16 lifts in total ran in phases over a 3 year period during which the building itself went through a major transformation adding additional floors and creating a new lower ground link from the City s Town Hall to the Library complex The resulting vertical transportation within the building is highlighted by the two 16 person 1 6m s scenic passenger lifts set within the Central Circulation Core The subtle radius of the shafts provided an engineering challenge which was readily met by ANSA working with our key supply partners at Wittur The project enabled ANSA to demonstrate not just our engineering capabilities but also our commitment to the lift industry local economy and our own corporate social responsibility We engaged two modern apprentices on the project who worked on all aspects of the design and build process Our apprentice training is a mainstay within the company The opportunity to contribute to the Manchester Central Library Trust Time Capsule with both financial support and a cultural input was a particular highlight of the project As one part of our sponsorship role ANSA commissioned a local artist to create a mosaic in the image of the Manchester Bee signifying the city s industrious heritage which now forms part of the time capsule exhibit The Scenic Lifts are in MRL format with the Kollmorgen control system installed remote from the shafts in order to meet the strict clean line requirement of the architect The finished result delivers a solution which will meet the high traffic demands in a building which now provides Manchester with a world class information resource performance spaces and cultural reference points for the 21st century Library Complex The Duplex passenger lifts featured in this article are AC PM gearless MRL traction 1275kg 17 person MRL traction passenger lifts WITTUR W Line format bespoke feature framed glass cars 2 newly formed purpose built 33 metre high free standing glazed and steel shaft structures set to follow same radial profile of building external elevation 1 6m s contract speed 26 metre travel serving 6 floors via single car entry arrangement SELCOM AC VF belt driven Vector controlled MIDI Plus door operating systems with Hydra series brushed satin stainless steel framed glass panels SAD WSG Servo gearless AC synchronous permanent magnet machines Kollmorgen MPK400 DPC4 SERIAL microprocessor control systems High resolution TFT display systems and Dewhurst LED dual illuminate micro movement Jumbo series control fixtures Further to the above The entire Library and Town Hall project required ANSA to deliver a

    Original URL path: http://www.cibseliftsgroup.org/index.php/home/47-feature/101-manchester-central-library-town-hall-project (2016-02-10)
    Open archived version from archive

  • Lift Academy Paper Competition
    of young engineers coming through who are able to write for the industry trade journals and make presentations at industry symposiums and seminars Terms and Conditions The competition will start on 1st January 2015 and papers shall be submitted by 30th June 2015 Papers shall be relative to the lift or escalator industry Authors shall have the approval of their employers to enter the competition and a declaration willneed to be signed to that effect The chosen topic for the 2015 competition is SAFE WORKING The paper shall not exceed 2000 words plus diagrams and or photographs Diagrams and photographs shall be indexed and referenced The paper shall include the author s details title executive summary technical section and conclusion The paper shall be peer reviewed internally by the author s employers and a declaration shall be signed by the employer confirming they are content with the submission The paper shall be peer reviewed by a panel of four judges selected from CIBSE Lifts Group Lift Academy a trade journal and LEIA The paper shall be submitted in an A4 format in a PDF format and shall be produced using a word processor Hand written entries are not acceptable The winning author will be expected to attend a CIBSE Lifts Group meeting to accept their prize The CIBSE Lifts Group reserves the option to ask the winning author to present their presentation at a CIBSE Lifts Group meeting Travel and accommodation expenses where applicable and to be agreed in advance within the UK will be reimbursed The winning author may be invited to present either in person or as a poster display at the annual Lift Symposium at Northampton Authors with no or limited experience need not be dissuaded from presentations as assistance will be given by a peer from

    Original URL path: http://www.cibseliftsgroup.org/index.php/home/47-feature/102-lift-academy-paper-competition (2016-02-10)
    Open archived version from archive

  • CIBSE Lifts Group
    commitment of Manchester City Council and Laing O Rourke in utilising strong local skills on such a complex and prestigious project The contract required detailed traffic analysis design and engineering input from the outset The strict requirements of Manchester City Councils Design for Access DFA2 criteria demanding high levels of functionality for all users coupled to a strict aesthetic brief from the architects ANSA were able to meet all of these requirements in house The whole of the project which involved 16 lifts in total ran in phases over a 3 year period during which the building itself went through a major transformation adding additional floors and creating a new lower ground link from the City s Town Hall to the Library complex The resulting vertical transportation within the building is highlighted by the two 16 person 1 6m s scenic passenger lifts set within the Central Circulation Core The subtle radius of the shafts provided an engineering challenge which was readily met by ANSA working with our key supply partners at Wittur The project enabled ANSA to demonstrate not just our engineering capabilities but also our commitment to the lift industry local economy and our own corporate social responsibility We engaged two modern apprentices on the project who worked on all aspects of the design and build process Our apprentice training is a mainstay within the company The opportunity to contribute to the Manchester Central Library Trust Time Capsule with both financial support and a cultural input was a particular highlight of the project As one part of our sponsorship role ANSA commissioned a local artist to create a mosaic in the image of the Manchester Bee signifying the city s industrious heritage which now forms part of the time capsule exhibit The Scenic Lifts are in MRL format with the Kollmorgen control system installed remote from the shafts in order to meet the strict clean line requirement of the architect The finished result delivers a solution which will meet the high traffic demands in a building which now provides Manchester with a world class information resource performance spaces and cultural reference points for the 21st century Library Complex The Duplex passenger lifts featured in this article are AC PM gearless MRL traction 1275kg 17 person MRL traction passenger lifts WITTUR W Line format bespoke feature framed glass cars 2 newly formed purpose built 33 metre high free standing glazed and steel shaft structures set to follow same radial profile of building external elevation 1 6m s contract speed 26 metre travel serving 6 floors via single car entry arrangement SELCOM AC VF belt driven Vector controlled MIDI Plus door operating systems with Hydra series brushed satin stainless steel framed glass panels SAD WSG Servo gearless AC synchronous permanent magnet machines Kollmorgen MPK400 DPC4 SERIAL microprocessor control systems High resolution TFT display systems and Dewhurst LED dual illuminate micro movement Jumbo series control fixtures Further to the above The entire Library and Town Hall project required ANSA to deliver

    Original URL path: http://www.cibseliftsgroup.org/index.php/component/content/article/47-feature/101-manchester-central-library-town-hall-project (2016-02-10)
    Open archived version from archive

  • CIBSE Lifts Group
    of young engineers coming through who are able to write for the industry trade journals and make presentations at industry symposiums and seminars Terms and Conditions The competition will start on 1st January 2015 and papers shall be submitted by 30th June 2015 Papers shall be relative to the lift or escalator industry Authors shall have the approval of their employers to enter the competition and a declaration willneed to be signed to that effect The chosen topic for the 2015 competition is SAFE WORKING The paper shall not exceed 2000 words plus diagrams and or photographs Diagrams and photographs shall be indexed and referenced The paper shall include the author s details title executive summary technical section and conclusion The paper shall be peer reviewed internally by the author s employers and a declaration shall be signed by the employer confirming they are content with the submission The paper shall be peer reviewed by a panel of four judges selected from CIBSE Lifts Group Lift Academy a trade journal and LEIA The paper shall be submitted in an A4 format in a PDF format and shall be produced using a word processor Hand written entries are not acceptable The winning author will be expected to attend a CIBSE Lifts Group meeting to accept their prize The CIBSE Lifts Group reserves the option to ask the winning author to present their presentation at a CIBSE Lifts Group meeting Travel and accommodation expenses where applicable and to be agreed in advance within the UK will be reimbursed The winning author may be invited to present either in person or as a poster display at the annual Lift Symposium at Northampton Authors with no or limited experience need not be dissuaded from presentations as assistance will be given by a peer from

    Original URL path: http://www.cibseliftsgroup.org/index.php/component/content/article/47-feature/102-lift-academy-paper-competition (2016-02-10)
    Open archived version from archive

  • Manchester Central Library & Town Hall Project
    of Manchester City Council and Laing O Rourke in utilising strong local skills on such a complex and prestigious project The contract required detailed traffic analysis design and engineering input from the outset The strict requirements of Manchester City Councils Design for Access DFA2 criteria demanding high levels of functionality for all users coupled to a strict aesthetic brief from the architects ANSA were able to meet all of these requirements in house The whole of the project which involved 16 lifts in total ran in phases over a 3 year period during which the building itself went through a major transformation adding additional floors and creating a new lower ground link from the City s Town Hall to the Library complex The resulting vertical transportation within the building is highlighted by the two 16 person 1 6m s scenic passenger lifts set within the Central Circulation Core The subtle radius of the shafts provided an engineering challenge which was readily met by ANSA working with our key supply partners at Wittur The project enabled ANSA to demonstrate not just our engineering capabilities but also our commitment to the lift industry local economy and our own corporate social responsibility We engaged two modern apprentices on the project who worked on all aspects of the design and build process Our apprentice training is a mainstay within the company The opportunity to contribute to the Manchester Central Library Trust Time Capsule with both financial support and a cultural input was a particular highlight of the project As one part of our sponsorship role ANSA commissioned a local artist to create a mosaic in the image of the Manchester Bee signifying the city s industrious heritage which now forms part of the time capsule exhibit The Scenic Lifts are in MRL format with the Kollmorgen control system installed remote from the shafts in order to meet the strict clean line requirement of the architect The finished result delivers a solution which will meet the high traffic demands in a building which now provides Manchester with a world class information resource performance spaces and cultural reference points for the 21st century Library Complex The Duplex passenger lifts featured in this article are AC PM gearless MRL traction 1275kg 17 person MRL traction passenger lifts WITTUR W Line format bespoke feature framed glass cars 2 newly formed purpose built 33 metre high free standing glazed and steel shaft structures set to follow same radial profile of building external elevation 1 6m s contract speed 26 metre travel serving 6 floors via single car entry arrangement SELCOM AC VF belt driven Vector controlled MIDI Plus door operating systems with Hydra series brushed satin stainless steel framed glass panels SAD WSG Servo gearless AC synchronous permanent magnet machines Kollmorgen MPK400 DPC4 SERIAL microprocessor control systems High resolution TFT display systems and Dewhurst LED dual illuminate micro movement Jumbo series control fixtures Further to the above The entire Library and Town Hall project required ANSA to deliver a

    Original URL path: http://www.cibseliftsgroup.org/index.php/events/47-feature/101-manchester-central-library-town-hall-project (2016-02-10)
    Open archived version from archive

  • Lift Academy Paper Competition
    of young engineers coming through who are able to write for the industry trade journals and make presentations at industry symposiums and seminars Terms and Conditions The competition will start on 1st January 2015 and papers shall be submitted by 30th June 2015 Papers shall be relative to the lift or escalator industry Authors shall have the approval of their employers to enter the competition and a declaration willneed to be signed to that effect The chosen topic for the 2015 competition is SAFE WORKING The paper shall not exceed 2000 words plus diagrams and or photographs Diagrams and photographs shall be indexed and referenced The paper shall include the author s details title executive summary technical section and conclusion The paper shall be peer reviewed internally by the author s employers and a declaration shall be signed by the employer confirming they are content with the submission The paper shall be peer reviewed by a panel of four judges selected from CIBSE Lifts Group Lift Academy a trade journal and LEIA The paper shall be submitted in an A4 format in a PDF format and shall be produced using a word processor Hand written entries are not acceptable The winning author will be expected to attend a CIBSE Lifts Group meeting to accept their prize The CIBSE Lifts Group reserves the option to ask the winning author to present their presentation at a CIBSE Lifts Group meeting Travel and accommodation expenses where applicable and to be agreed in advance within the UK will be reimbursed The winning author may be invited to present either in person or as a poster display at the annual Lift Symposium at Northampton Authors with no or limited experience need not be dissuaded from presentations as assistance will be given by a peer from

    Original URL path: http://www.cibseliftsgroup.org/index.php/events/47-feature/102-lift-academy-paper-competition (2016-02-10)
    Open archived version from archive

  • Legislation Related to Lifts, Escalators and Moving Walks
    of Member States relating to machinery 90 486 EWG 90 486 EEC 90 486 CEE COUNCIL DIRECTIVE of 17 September 1990 amending Directive 84 529 EEC on the approximation of the laws of the Member States relating to electrically operated lifts 90 486 EEC 95 16 EG 95 16 EC 95 16 CE European Parliament and Council Directive 95 16 EC of 29 June 1995 on the approximation of the laws of the Member States relating to lifts 95 16 EGVerz 2000 95 16 ECVerz 2000 95 16 CEVerz 2000 00 C292 01 List of notified bodies designated by the Member States and the EFTA countries EEA Members under the new approach Directives DIRECTIVE 2006 42 EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCILof 17 May 2006 on machinery and amending Directive 95 16 EC recast came into force on 29 December 2009 A3 1 2 Relevant UK legislation The Supply of Machinery Safety Regulations 1992 Statutory Instruments 1992 No 3073 as amended by the Supply of Machinery Safety Amendment Regulations Statutory Instruments 1994 No 2063 and Supply of Machinery Safety Amendment Regulations Statutory Instruments 2005 No 831 The Supply of Machinery Safety Regulations 2008 Statutory Instruments 2008 No

    Original URL path: http://www.cibseliftsgroup.org/index.php/codes-and-standards/40-uncategorised/51-legislation-related-to-lifts-escalators-and-moving-walks (2016-02-10)
    Open archived version from archive



  •