archive-org.com » ORG » E » EASTVALLEY.ORG

Total: 195

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • BIDS | East Valley Water District, CA - Official Website
    Twitter Google Pinterest Delicious Stumble Upon Blogger LinkedIn Windows Live Home My Account Printer Friendly Email Page Contact Us RSS Site Map Translate Page Notifications Documents BIDS Notify Me Conservation Pay My Bill Report a Concern Home Contact Us Site

    Original URL path: http://www.eastvalley.org/268/BIDS (2016-04-29)
    Open archived version from archive


  • Recycled Water Effort | East Valley Water District, CA - Official Website
    Feasibility Study East Valley Water District worked with RMC Water and Environment to conduct a feasibility study for the construction of a wastewater reclamation facility View final Feasibility Study October 2014 View Revised Feasibility Study March 2015 During this process a variety of issues were researched and evaluated to provide a recommendation for addressing the existing sewer capacity limitations The project will consider Community Concerns Environmental Impacts and Benefits Technical Feasibility Permits and Institutional Agreements Plant Location Technical Criteria Determine existing wastewater flows including current septic tank users Appropriate level of treatment Hydrology and elevation concerns including proximity to recharge basins Maximizing value to future capital Community Considerations Aesthetics Quality of life Property values Consistency with community values Project benefits Determining a Location The study reviewed potential locations for a wastewater reclamation facility within the East Valley Water District service area and determined that the ideal location is Del Rosa Avenue between 5th and 6th Avenue Facility Design Many urban cities have constructed wastewater reclamation facilities in a way to allow for full functionality while blending seamlessly with the community Permitting and Institutional Process Wastewater reclamation facilities require coordination with multiple state and local government agencies and most importantly members of the community Process for a Preliminary Analysis of Environmental Impacts Throughout the process engage with members of the public for review and input Identify environmental issues Determine scope of environmental process Prepare environmental documents Project Goals Identify potential long term and short term benefits to District stakeholders Determine the most feasible project Identify all necessary permits authorizations and environmental clearances Conduct extensive outreach with the community and local agencies If appropriate establish a timeline for implementation Opportunities for Community Involvement and Updates For more information sign up here to be added to the project email list or contact the

    Original URL path: http://www.eastvalley.org/281/Wastewater-Reclamation-Feasibility-Study (2016-04-29)
    Open archived version from archive

  • Engineering Services | East Valley Water District, CA - Official Website
    Master Plan Water Master Plan Sewer System Management Plan SSMP Title Notify Me Search Facebook Twitter Google Pinterest Delicious Stumble Upon Blogger LinkedIn Windows Live Home My Account Printer Friendly Email Page Contact Us RSS Site Map Translate Page Notifications Documents Engineering Forms Sewer Standards Water Standards Sewer Master Plan Water Master Plan Sewer System Management Plan SSMP Notify Me Conservation Pay My Bill Report a Concern Home Contact Us

    Original URL path: http://www.eastvalley.org/119/Engineering-Services (2016-04-29)
    Open archived version from archive

  • Engineering Forms | East Valley Water District, CA - Official Website
    Final Design for Water Payment Application for Sewer Inspection Payment Application for Water Inspection Sewer or Water Availability Unavailability Request Temporary Fire Hydrant Meter Request Water and Sewer Service Fees Inspections Construction Restrictions Form Title Notify Me Search Facebook Twitter Google Pinterest Delicious Stumble Upon Blogger LinkedIn Windows Live Home My Account Printer Friendly Email Page Contact Us RSS Site Map Translate Page Notifications Documents Engineering Forms Sewer Standards Water

    Original URL path: http://www.eastvalley.org/247/Engineering-Forms (2016-04-29)
    Open archived version from archive

  • Sewer Standards | East Valley Water District, CA - Official Website
    ABS Pipe Layout S 108 Dead End Frame and Cover S 109 Sewer Saddle Layout S 110 Sewer General Notes and Certificates Sewer Main Crossing Standard Specifications for the Design and Processing of Sanitary Sewer Plans Standard Specifications for the Furnishing of Materials and the Construction of Sanitary Sewers Title Notify Me Search Facebook Twitter Google Pinterest Delicious Stumble Upon Blogger LinkedIn Windows Live Home My Account Printer Friendly Email

    Original URL path: http://www.eastvalley.org/269/Sewer-Standards (2016-04-29)
    Open archived version from archive

  • Water Standards | East Valley Water District, CA - Official Website
    Sewer and Water W 106 Crossing Protection Zones for Sewer and Water W 107 Thrust Block W 108 DDC 90 Assembly W 109 Low Profile DDC N Shape Assembly W 110 Pipe Barricades W 111 Fire Hydrant Assembly W 112 RPP Assembly W 114A RPP Requirements W 114B Dual Water Service Installation W 115 Water Main Crossing Water Standards All Water Plan Construction Water Plan Processing Title Notify Me Search

    Original URL path: http://www.eastvalley.org/270/Water-Standards (2016-04-29)
    Open archived version from archive

  • Sewer Master Plan | East Valley Water District, CA - Official Website
    Flow Monitoring Study Appendix D Weekday and Weekend Diurnal Curves Appendix E Dry Weather Calibration Graphs Appendix F Model Results Appendix G Hydraulic Profiles for Areas on the Watch List Appendix H WRP Considerations Appendix I Pipe Survival Curves Appendix J Condition Database Appendix K CIP Detail CIP Exhibit Title Notify Me Search Facebook Twitter Google Pinterest Delicious Stumble Upon Blogger LinkedIn Windows Live Home My Account Printer Friendly Email

    Original URL path: http://www.eastvalley.org/279/Sewer-Master-Plan (2016-04-29)
    Open archived version from archive

  • Water Master Plan | East Valley Water District, CA - Official Website
    Feasibility Capital Improvement Program Appendix A References Appendix B Calibration Plan Appendix C Extended Period Calibration Results Appendix D Fire Flow Improvements Appendix E Existing System Facility Assessment Appendix F Potential Recycled Water Customers Title Notify Me Search Facebook Twitter Google Pinterest Delicious Stumble Upon Blogger LinkedIn Windows Live Home My Account Printer Friendly Email Page Contact Us RSS Site Map Translate Page Notifications Documents Engineering Forms Sewer Standards Water

    Original URL path: http://www.eastvalley.org/280/Water-Master-Plan (2016-04-29)
    Open archived version from archive



  •