archive-org.com » ORG » L » LGVSD.ORG

Total: 72

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • Resolutions | Las Gallinas Valley Sanitary District
    Systems Report Infiltrations and Inflow INI Sanitary Sewer Overflow Reclamation Area Green Energy Power Reclamation Walking Paths Wildlife Information Wastewater Treatment Pollution Prevention Recycled Water Facility Treatment Process What not to put down your Drain Facilities Tour Doing Business Project Planning Applications and Permits Brochure for Plumbers Sewer Contractors Permit Process Specifications Rate Information Current Rate Schedule Prop 218 Rate Increase Supporting Ordinances Sewer Lateral Assistance Infiltrations and Inflow INI

    Original URL path: http://www.lgvsd.org/document-library/resolutions/ (2016-05-01)
    Open archived version from archive


  • Sanitary Sewer Management Plan (SSMP) | Las Gallinas Valley Sanitary District
    not to put down your Drain Facilities Tour Doing Business Project Planning Applications and Permits Brochure for Plumbers Sewer Contractors Permit Process Specifications Rate Information Current Rate Schedule Prop 218 Rate Increase Supporting Ordinances Sewer Lateral Assistance Infiltrations and Inflow INI Area Plumbers Documents Collection System Reports Current Construction Projects Finance and Budget Ordinance Code Resolutions Sanitary Sewer Management Plan SSMP Strategic Plan The Heron Newsletter Sanitary Sewer Management Plan SSMP The Sanitary Sewer Management Plan SSMP is a document that all public sewer system agencies are required to develop and implement under an order issued by the State Water Resources Control Board Order 2006 003 DWQ and by similar requirements issued by the SF Bay Regional Water Quality Control Board The purpose of the SSMP is to facilitate proper management of the sewer system a k a collection system and in so doing reduce occurrences of sanitary sewer overflows SSOs Sanitary Sewer Management Plan SSMP 2013 Update Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Appendix G The District s SSMP consists of eleven elements that address the following areas Goals Design and Construction Standards Organization Capacity Management Monitoring Measuring and Program Modifications Fats Oils

    Original URL path: http://www.lgvsd.org/document-library/sanitary-sewer-management-plan-ssmp/ (2016-05-01)
    Open archived version from archive

  • Strategic Plan | Las Gallinas Valley Sanitary District
    Report Infiltrations and Inflow INI Sanitary Sewer Overflow Reclamation Area Green Energy Power Reclamation Walking Paths Wildlife Information Wastewater Treatment Pollution Prevention Recycled Water Facility Treatment Process What not to put down your Drain Facilities Tour Doing Business Project Planning Applications and Permits Brochure for Plumbers Sewer Contractors Permit Process Specifications Rate Information Current Rate Schedule Prop 218 Rate Increase Supporting Ordinances Sewer Lateral Assistance Infiltrations and Inflow INI Area

    Original URL path: http://www.lgvsd.org/document-library/strategic-plan/ (2016-05-01)
    Open archived version from archive

  • Emergency Information | Las Gallinas Valley Sanitary District
    INI Sanitary Sewer Overflow Reclamation Area Green Energy Power Reclamation Walking Paths Wildlife Information Wastewater Treatment Pollution Prevention Recycled Water Facility Treatment Process What not to put down your Drain Facilities Tour Doing Business Project Planning Applications and Permits Brochure for Plumbers Sewer Contractors Permit Process Specifications Rate Information Current Rate Schedule Prop 218 Rate Increase Supporting Ordinances Sewer Lateral Assistance Infiltrations and Inflow INI Area Plumbers Documents Collection System Reports Current Construction Projects Finance and Budget Ordinance Code Resolutions Sanitary Sewer Management Plan SSMP Strategic Plan The Heron Newsletter Emergency Information Main Telephone 415 472 1734 available 24 hours per day All telephone calls to our main number will be forwarded to our answering service during the hours of 3 00 PM through 6 30 AM Monday through Friday and all day on Saturday Sundays and holidays If unable to connect to our answering service to report the emergency please utilize the procedures below to connect to our plant For any Pump Station or Plant related call including alarms or police calls after 3 00 PM and before 6 30 AM on weekdays and anytime on Saturdays Sundays and holidays please call Please go down the list CALL UNTIL YOU REACH SOMEONE Name Cell Phone call 1st Pager call 2nd Plant Manager 415 747 2840 415 747 2840 Plant Operations Supervisor J B 415 747 7034 415 458 4107 Operator C C 415 755 0570 415 258 5004 Operator G W 415 747 7040 415 258 5203 Operator J S 415 747 7030 415 258 5161 General Manager 707 372 2165 Sewer Backups Spills and Collection System Related Emergencies Weekdays after 3 00 PM and before 6 30 AM and anytime on Saturdays Sundays and Holidays Go down the list CALL UNTIL YOU REACH SOMEONE Call the COLLECTION PAGER

    Original URL path: http://www.lgvsd.org/about-us/contact-us/emergency-information/ (2016-05-01)
    Open archived version from archive

  • Blending Wastewater | Las Gallinas Valley Sanitary District
    is removed oxidized by bacteria and other microorganisms A portion of the flow is routed around i e bypasses secondary treatment and then recombines with the main flow prior to disinfection When blending all flows undergo disinfection and the treatment plant is still required to meet all applicable regulatory limits in its discharge permit Blending is used at the LGVSD plant when plant flows which are typically in the range of 2 4 million gallons per day in the winter exceed 8 million gallons per day Blending usually lasts for between 2 8 hours but can persist for a day or more during extreme storm events Blending events including duration and volume are reported below What Can Be Done to Reduce the Need for Blending High wet weather flows to the treatment plant occur as a result of rainwater entering the sewer system Much of this occurs underground in older sewer mains and manholes which are District owned and in sewer laterals which are privately owned Property owners have a responsibility to ensure that their sewer laterals are in good working order Most of the sewer laterals have not been replaced and are very old and leaky They are a large part of the problem which ultimately increases sewer rates The District has a Sewer Lateral Assistance program to help property owners finance the replacement of their sewer lateral Property owners should also make sure that their on site storm drainage systems roof surface and foundation drains and swimming pools are not connected to the sewer system The District has a continuous program for replacing old sewer mains and other sewer infrastructure funded by a portion of the fees that customers pay to use the sewer system The District is also in the process of designing improvements to upgrade aging

    Original URL path: http://www.lgvsd.org/facilities/wastewater-treatment/blending/ (2016-05-01)
    Open archived version from archive

  • Site Map | Las Gallinas Valley Sanitary District
    Meeting Archive 2013 Meeting Archive 2012 Meeting Archive 2011 Meeting Archive Board of Directors Contact Us Directions Locations Emergency Information News Release in the news April 5 2013 LGVSD Receives Certificate of Achievement for Excellence in Financial Reporting August 19 2013 Transparency Certificate of Excellence Awarded to Las Gallinas Valley Sanitary District December 5 2012 Heavy rainstorm contributes to capacity problems at Las Gallinas Valley Sanitary District wastewater treatment plant December 5 2013 Las Gallinas Valley Sanitary District Seeks Public Input on Potential Changes to the way Sewer Bills are Calculated January 10 2013 Las Gallinas Valley Sanitary District Schedules Emergency Repair Night Work January 4 2013 Las Gallinas Valley Sanitary District Schedules Emergency Repair Night Work March 26 2014 LGVSD Receives Certificate of Achievment for Excellence in Financial Reporting November 7 2013 Las Gallinas Valley Sanitary District Seeks Public Input on Potential Changes to the way Sewer bills are Calculated October 2 2012 Las Gallinas Valley Sanitary District responds quickly to contain spill at Descanso pump station October 5 2012 Las Gallinas Valley Sanitary District revises estimate of sewage spill at Descanso pump station September 25 2012 Recycled water now flows to North County from new LGVSD treatment facility Employment Opportunities LGVSD Staff Organizational Chart Pay Scale Summary Memberships Our Service Area Partnerships Other Organizations Agencies Stream Restoration Groups Customer Center Document Library Collection System Reports Current Construction Projects Project Documents File Depot Finance and Budget Ordinance Code Resolutions Resolutions 2010 Resolutions 2011 Resolutions 2012 Resolutions 2013 Resolutions 2014 Resolutions 2015 Resolutions 2016 Sanitary Sewer Management Plan SSMP Strategic Plan The Heron Newsletter Facilities Collection System Collection Systems Report Sanitary Sewer Overflow Reclamation Area Green Energy Power Wastewater Treatment Blending Pollution Prevention Recycled Water Facility Recycled Water Safety Frequently Asked Questions Regulations and Studies Useful Links Treatment Process What

    Original URL path: http://www.lgvsd.org/site-map/ (2016-05-01)
    Open archived version from archive

  • 2016 Meeting Archive | Las Gallinas Valley Sanitary District
    Brochure for Plumbers Sewer Contractors Collection Systems Report Infiltrations and Inflow INI Sanitary Sewer Overflow Reclamation Area Green Energy Power Reclamation Walking Paths Wildlife Information Wastewater Treatment Pollution Prevention Recycled Water Facility Treatment Process What not to put down your Drain Facilities Tour Doing Business Project Planning Applications and Permits Brochure for Plumbers Sewer Contractors Permit Process Specifications Rate Information Current Rate Schedule Prop 218 Rate Increase Supporting Ordinances Sewer Lateral Assistance Infiltrations and Inflow INI Area Plumbers Documents Collection System Reports Current Construction Projects Finance and Budget Ordinance Code Resolutions Sanitary Sewer Management Plan SSMP Strategic Plan The Heron Newsletter 2016 Meeting Archive Meeting Agenda Support Documents Handouts Minutes June 30 2016 June 23 2016 Cancellation June 9 2016 May 26 2016 May 12 2016 April 28 2016 April 28 2016 Agenda Packet 2B 3C 4G April 14 2016 April 14 2016 Agenda Packet 2B 2G 3 04 14 2016 March 24 2016 March 24 2016 Agenda Packet 2B 03 24 2016 March 18 2016 March 18 2016 Agenda Packet 2 03 18 2016 March 10 2016 March 10 2016 Agenda Packet 2B 3 03 10 2016 February 25 2016 February 25 2016 Agenda Packet 2B 2M 2O 5A

    Original URL path: http://www.lgvsd.org/about-us/agendas-minutes/2016-meeting-archive/ (2016-05-01)
    Open archived version from archive

  • 2015 Meeting Archive | Las Gallinas Valley Sanitary District
    Code Resolutions Sanitary Sewer Management Plan SSMP Strategic Plan The Heron Newsletter 2015 Meeting Archive Meeting Agenda Support Documents Handouts Minutes December 24 2015 Cancellation December 10 2015 December 10 2015 Agenda Packet 3B 12 10 2015 November 26 2015 Cancellation November 12 2015 November 12 2015 Agenda Packet 3B 11 12 2015 November 11 2015 November 11 2015 Agenda Packet 2 11 11 2015 October 22 2015 October 22 2015 Agenda Packet 2B 2G 3 3 1 3 2 10 22 2015 October 8 2015 October 8 2015 Agenda Packet 2B 4C 10 08 2015 September 24 2015 September 24 2015 Agenda Packet 2B 6A 09 24 2015 September 10 2015 September 10 2015 Agenda Packet 2B 2P 2Q 09 10 2015 August 27 2015 Cancellation August 13 2015 Cancellation August 6 2015 August 6 2015 Agenda Packet 2B 2F 2G 3A 6 08 06 2015 July 23 2015 July 23 2015 Agenda Packet 1 2B 2D 3 3A 4G 7 07 23 2015 July 17 2015 July 17 2015 Agenda Packet No Handouts 07 17 2015 July 9 2015 Cancellation June 25 2015 June 25 2015 Agenda Packet 6B 06 25 2015 June 11 2015 June 11 2015 Agenda Packet 3 5B 6 06 11 2015 May 28 2015 May 28 2015 Agenda Packet 2B 6B 05 28 2015 May 14 2015 May 14 2015 Agenda Packet 2B 6B 6G 05 14 2015 April 23 2015 April 23 2015 Agenda Packet 2B 2H 6B 04 23 2015 April 21 2015 April 21 2015 Agenda Packet No Handouts 04 21 2015 April 16 2015 April 16 2015 Agenda Packet 2 2 1 04 16 2016 April 9 2015 April 9 2015 Agenda Packet 2B 2C 3 4 6A 6B 6D 04 09 2015 March 27 2015 March 27 2015

    Original URL path: http://www.lgvsd.org/about-us/agendas-minutes/2015-meeting-archive/ (2016-05-01)
    Open archived version from archive



  •